MCQ - Mechanical TNPSC JTO
JTO - 538 - Industrial Robotics and Digital Manufacturing - 538 - Unit VI Industrial Robot Simulation Software
77)
The most important factor in pick-and-place programming is:
A.
B.
C.
D.
Answer: A
82)
Simulation-generated programs are transferred to robots via:
A.
B.
C.
D.
Answer: A
91)
If a robot produces 480 parts in 8 hours, productivity is:
A.
B.
C.
D.
Answer: A
92)
If each part costs ₹12 to machine and 300 parts are made, total cost is:
A.
B.
C.
D.
Answer: A
93)
If welding time is reduced from 5 minutes to 4 minutes per part, the cycle time reduction is:
A.
B.
C.
D.
Answer: A
95)
If robot cycle time is 30 seconds, the maximum output per hour is:
A.
B.
C.
D.
Answer: A
100)
The main goal of using simulation before production is:
A.
B.
C.
D.
Answer: A