MCQ - Mechanical TNPSC JTO
JTO - 538 - Industrial Robotics and Digital Manufacturing - 538 - Unit VI Industrial Robot Simulation Software
176)
Simulated device I/O must match the real I/O mapping so that:
A.
B.
C.
D.
Answer: A
178)
When exporting robot programs from simulation to controller, you must verify:
A.
B.
C.
D.
Answer: A
180)
Which protocol is commonly used for safety-related communication?
A.
B.
C.
D.
Answer: A
191)
Before running a new simulated program on the real robot you must:
A.
B.
C.
D.
Answer: A
192)
Guarding and interlocks must be tested during commissioning to ensure:
A.
B.
C.
D.
Answer: A
193)
When creating welding programs in simulation, you should model:
A.
B.
C.
D.
Answer: A
195)
Lockout/tagout (LOTO) procedures during maintenance require:
A.
B.
C.
D.
Answer: A
196)
When measuring productivity gains from simulation optimizations, measure:
A.
B.
C.
D.
Answer: A
198)
A safety checklist before running the cell automatically includes:
A.
B.
C.
D.
Answer: A
200)
Best practice when transferring a simulated program to hardware is to:
A.
B.
C.
D.
Answer: A